Manufacturing

48 KPIs

% lost manufacturing capacity
% of hazardous operational waste
[amount of hazardous operational waste] percentage of [operational waste]
Available capacity for ramping new or existing products
Average production costs of items
Average Unit Cost
Average Unit Cost = (Total Unit Cost)/(Total Quantity of Units)
Average wage for production employees
Defects per million opportunities (DPMO)
Electrical Energy Efficiency ratio
Equipment availability %
(Operating Time) percentage of (Planned Production Time)
Equipment performance %
Equipment quality %
(Good Pieces) percentage of (Total Pieces)
Finished Goods Turns (COGS/Average Value Finished Goods)
[COGS] divided by [Average Value Finished Goods]
First Pass Yield
First Run Quality Pass %
Loss ratio of material per order
[total lost material] percentage [total material of orders]
Maintenance costs as % of manufacturing costs
Manhour per (equivalent) unit
Manufacturing cycle time
Manufacturing Floor Space Cost
Manufacturing Information Systems Cost
Manufacturing Schedule Adherence
(|Scheduled Production - Actual Production|)/Scheduled Production
Mass balance
Mean-time between failure (MTBF)
New change orders
Number of manufacturing steps
Open change orders
Overall Equipment Effectiveness (OEE)
Availability x Performance x Quality
Overall Machine Efficiency
Production leadtime
Production Plan Variance
Production schedule attainment
Rate of damaged material by error of workers
[total material damage by worker error] percentage of [total material]
Rate of material defect by causes of material itself
Rate of rejects
(number of units of rejects of product) percentage of (total number of units of product)
Ratio of actual capacity to rated capacity
Ratio of actual to design input required to produce one unit of output
Ratio of actual to projected unit production costs
Raw material turns (COGS/Average raw material)
[COGS] divided by [Average raw material]
Scrap value %
Stock in excess of next 60 days needs
TAKT Time
Total weight of packaging disposed to landfill
Value Added Time
Water used per amount of product manufactured
[total amount for water used] divided by [total units of product manufactured]
WIP
Work-in-Progress turns (COGS/Average value WIP)
[COGS] divided by [Average value WIP]
Yield %
(Process free of defects) as a percentage of (total process)
Yield Variability