Cost of Engineering Change in Design

VRM Product[None]Money

Definition

Average total cost associated with performing an engineering change prior to production release. This measure shows the cost of performing an enginemen change. A high cost indicates nonvalue-added activity. The client's awareness of this cost shows the trade-off value of nonvalue-added changes.

Formula

Register or log in to view the calculation formula. Sign up or log in.

Tags

change, release, design, engineering, cost

Metadata

Category: VRM Product · Added: May 17, 2026

No ratings yet
Comments (0)

Log in to rate and comment.

Be the first to comment on this KPI.