Design and production hours per square meter

Architecture[None]Time

Definition

This KPI shows the required man hours of deign in compare to the built up are of the project. It is going to be changed according to the project type but it gives a role of thumb to estimate the required mana hour for deign and production of tender documents drawings.

Formula

Register or log in to view the calculation formula. Sign up or log in.

Tags

design, production, architecture

Metadata

Category: Architecture · Added: May 17, 2026

No ratings yet
Comments (0)

Log in to rate and comment.

Be the first to comment on this KPI.